8/15/2023 0 Comments Tire trax springdale![]() ![]() “The contractor will remove the signs and barricades when the sidewalks are ready for foot traffic, but not before.” “Please respect ‘sidewalk closed’ signs and stay off barricaded sidewalks,” the news release states. Poured concrete can take several days to cure, depending on the temperature, and may remain soft despite appearance. A portion of sidewalk along state Route 9 in Springdale where footprints are visible in newly poured concrete, Springdale, Utah, Ma| Photo by Joseph Witham, St. “It’s a big cost that’s incurred,” Smith said. Replacing the ruined sections of sidewalk will be costly and delay the road project, according to a news release issued by Springdale Friday. In some cases, the concrete was only poured days ago. On some portions of sidewalk, deep imprints are visible in the now-hardened concrete. The sections of sidewalk requiring a redo run along state Route 9, which is currently under reconstruction by the Utah Department of Transportation. “Now Sunroc has to come back through and tear that up and redo the sidewalks to get rid of the prints,” Smith said. Watch video in the media player top of this report. “Some of the concrete that was put in was still wet and people have ridden their bicycles through or have walked on it, which leaves permanent prints,” Springdale Mayor Stan Smith said. SPRINGDALE - Springdale officials are dealing with quite a headache after freshly poured concrete throughout the town was ruined by foot and bicycle traffic, despite the fact that the newly minted sidewalks were covered and taped off. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |